The Challenge: Ensuring Robustness and Load Capacity in High-Performance Terraces
The E3 & E4 Wood Wharf development presented a unique challenge: designing terraces capable of supporting high design loads for heavy equipment needed for facade/glass replacement and maintenance. The solution required robust materials, precise technical planning, and collaboration from the early stages of the project. RYNO needed to deliver a system that could meet the structural demands without compromising aesthetics, ensuring the terraces met the architectural vision.
Balancing performance and adaptability can be a complex task in high-demand projects. RYNO’s TerraSmart® Rail System provided a solution tailored to the specific needs of this development.
The Solution: The TerraSmart® Rail System – Designed for Strength and Precision
From the initial stages of RIBA 3 and 4, RYNO collaborated closely with the project architect, providing technical guidance to design a system that supported 80mm-thick concrete pavers. The TerraSmart® Rail System was selected to address the project’s requirements for strength, durability, and adaptability:
- Exceptional Load Capacity: Designed to handle high loads required for terrace access and facade maintenance.
- Flexible Design Solutions: The lattice frame structure supported a build-up ranging from 250mm to 350mm and accommodated the Pavers are 400x400mm pavers effectively.
- Precision in Installation: With curved edges in the project, RYNO recommended additional baseboards to support small cut paver edges, ensuring structural stability and aesthetic consistency.
RYNO’s involvement extended to working with Tilbury, the appointed subcontractor, providing hands-on support throughout the installation process.
Collaborative Problem-Solving: Tailored Support Every Step of the Way
Open communication and a proactive approach ensured the project’s challenges were addressed efficiently:
- Customized Lattice Frame: Engineered to meet the precise load requirements and void build-up specifications of the project.
- Edge Support: Baseboards were utilized to support smaller paver cuts, overcoming challenges posed by the curved terrace design.
- Streamlined Coordination: RYNO worked closely with Tilbury to ensure a smooth installation of the rail system and paving, aligning with the architectural vision and technical requirements.
Real Results: Durable, Aesthetically Pleasing Terraces
The successful installation of RYNO’s TerraSmart® Rail System resulted in robust terraces that seamlessly integrated with the Wood Wharf development. With precise engineering and a commitment to excellence, RYNO delivered a solution that balanced functionality with the elegance demanded by the project.